— Building Relationships —

Featured Projects


2209-2215 El Camino Real

Location: 2209-2215 El Camino Real, Palo Alto, Ca
Budget: $3,468,000
Project Size: 9,574 sq. ft.

This project was a new 3-story mixed use building.  The first floor is for retail use, the second floor is office space and the third floor is a residential unit.  This included a new elevator, landscaping and custom intelligent view glass for glare, heat and daylight control.  This was a LEED Platinum building.

    

Shutterfly

2800 & 3000 Bridge Pkwy, Redwood City, Ca
Budget: $6,925,997
Project Size: 92,000 sq. ft.

 

Regus 

Full demo and remodel of the interior for creative multi-tenant/co-working spaces.

101 Jefferson Dr., Menlo Park, Ca
Budget: $5,844,996
Project Size: 31,212 sq. ft.

           

                         

Levi’s Plaza 1160 Battery Street, Ste 100, San Francisco, CA
Budget: $4,023,095
Project Size: 33,463 sq. ft.

    

 

3031 Tisch Way, San Jose Ca
Budget: $5,194,637
Project Size: 24,591 sq. ft

2811 Orchard Pkwy.

Location: 2811 Orchard Pkwy., San Jose, Ca
Budget: $4,655,648
Project Size: 84,506 sq. ft.

This project was a remodel of the entire building  including the exterior and landscaping.  This was a design build project with all new plumbing, HVAC and electrical throughout.  All new finishes were installed including all new millwork with Quartz counters, wood screen walls, wood ceilings and trellises, hammered brass ceiling and wall panels.  All new glass was installed throughout the building and Lanai folding glass doors.

    

    

    

   

445 Lakeside

Location: 445 Lakeside Dr., Sunnyvale, Ca
Budget: $995,000
Project Size: 14,350 sq. ft.

This project was a remodel of the entire building including exterior and parking lot improvements.  This project included landscaping and an interior living walls.  The exterior improvements included structural improvements and custom size large scale metal panels with white Kynar Metallic finish.  The interior improvements included skylights, new storefront, conference rooms, new restroom finishes and polished concrete.

        

    

PneumRx

Location: 4255 Burton Dr., Santa Clara, Ca
Budget: $3,164,000
Project Size: 31,140 sq. ft.

This tenant improvement included a class 10,000 FDA approved medical grade clean room, 4 fume hoods for production and R & D, open office area, conference rooms and a break room with polished concrete.

         

        

    

St. Matthew’s Episcopal Day School

Location: 16 Baldwin Ave., 3rd Fl., San Mateo, Ca
Budget: $1,382,064
Project Size: 3,154 sq. ft.

This project was a build out of the entire 3rd floor of classrooms, art room, learning center, teachers lounge and restrooms.  There was custom millwork installed throughout and a custom stainless steel counter and sink for the art room.  We also installed the Alpaco Elegance line of restroom partitions for added privacy in the restrooms.

    

    

    

The Burkard School

Location: 2333 Palm Ave., San Mateo, CA 94403
Budget: $1,137,627
Project Size: 2,841 sq. ft.

This project was a restoration of uninhabitable dwellings that could not be demoed and rebuilt due to zoning and planning requirements.  A full seismic upgrade of the buildings was installed along with a full MEP and fire sprinkler upgrade.  We performed site work to pave the parking lot and install a new playground area.  A new perimeter fence was also installed.

   

   

Spinal Kinetics

Location: 501 Mercury Dr., Sunnyvale, Ca
Budget: $2,060,000
Project Size: 24,527 sq. ft.

This tenant improvement for a surgical implant manufacturing company was a build out of the interior of an entire building that included exterior improvements.  This project included a 2,468 sq. ft. CER ISO Class 10,000 FDA approved medical grade clean room, custom fume hoods, R & D lab, R & D machine shop, manufacturing area, executive board room, conference rooms and office space.  There was also a complete exterior upgrade of the building including landscaping.

    

    

San Mateo Gateway

Location: 1800 – 1820 Gateway Dr., San Mateo, Ca
Budget: $1,117,000

This project included exterior campus improvements, conference rooms and a fitness center.  The exterior campus improvements included new light bollards, EV charging stations, ADA parking lot upgrades and new landscaping.

    

    

    

Bridge Bank

Location: 55 Almaden Blvd., 7th Fl., San Jose, Ca
Budget: $1,180,000
Project Size: 17,250 sq. ft.

This project was a complete demolition and build out of a full floor that included custom casework, executive conference rooms and meeting rooms with Nana Wall operable partitions.

    

    

Bay Area News Group

Location: 4 N. 2nd St., 7th & 8th Fl., San Jose, Ca
Budget: $1,497,000
Project Size: 32,244 sq. ft.

This project was a complete demolition and build out of two floors that included custom casework, executive conference rooms and a media studio.  The two elevator lobbies were also included.

    

    

    

Tech Company Tenant Improvement

Location: Silicon Valley, Ca
Budget: $981,660

    

    

Tech Company Board Room

Location: Silicon Valley, Ca
Budget: $510,322

    

Action Urgent Care

Location: Various Locations In San Jose, Ca
Budget: $335,000 – 502,000

Medical office tenant improvements that included reception, exam rooms, procedure rooms, x-ray rooms and labs.

    

    

One Medical

Location: 98 Gough St., San Francisco, Ca
Budget: $420,000
Project Size: 2,525 sq. ft.

This project was in a new ground level commercial space that features a residential space above. The structure is post tension concrete and includes underground parking. Communication and careful scheduling was key to keeping the residents environment stable and not causing any disruption. This build out features exposure to the busy streets with tall windows at the waiting room. Work included new consult rooms, waiting room, and restrooms. This project also included custom case work and high end materials.

        

Location: 1299 A Oakmead Parkway,  Sunnyvale, Ca
Budget: $275,000
Project Size: 3,052 sq. ft.

High end medical office build-outs completed on fast track schedules. This project was a full demo and build out in a single story wood frame structure. Work included new consult rooms, waiting rooms, and restrooms. This project also included custom case work and high end materials.

                

50 W. San Fernando Capital Improvements


Location: San Jose, Ca

Budget: $1,422,668

Major occupied remodel of main lobby, management office, four floors of restrooms and elevator lobbies. Main lobby featured new curved stone reception desk, Interlam wood wall panels and custom chandelier. All elevator cabs were refurbished. Restrooms were a complete tear out with new fixtures and finishes installed. Two floors were completely demolished and new finishes were installed for return to market.      

        

    

Duarte

Location: 755 N. Mary Ave., Sunnyvale, Ca
Budget: $2,235,500
Project Size: 32,000 sq. ft.

Complete interior demolition and new build out.  Project includes conference rooms, training room, specialty video and sound studio.  Open ceiling and office plan design.  Specialty light fixtures and architectural wood features.  All work performed on a fast track schedule.

    

    

IDC

Location: 155 Bovet Rd., Ste. 600, San Mateo, Ca
Budget: $345,733
Project Size: 10,000 sq. ft.

This project was a tenant improvement of conference rooms, break room and offices. Work included new can lighting, granite countertops and LVT flooring.

Quantros

Location: 475 Sycamore Ave., Milpitas, Ca
Budget: $852,710
Project Size: 56,000 sq. ft.

Fast track build out of Class “A” conference rooms and offices. The project also included engineering labs, R & D facilities and extensive server room and data requirements. The project was completed within a five week timeline.

                

Kawasaki Robotics

Location: 30 W. Montague, San Jose, Ca
Budget: $487,482
Project Size: 21,000 sq. ft.

This tenant improvement was a build out of a specialized R & D facility, including lab space and high end offices.

        

D2M

Location: 935 Benecia Rd., Sunnyvale, Ca
Budget: $486,770
Project Size: 9,576 sq. ft.

This tenant improvement was a complete demo and build out of an existing building.  The project included structural upgrades, skylights, wood feature walls and coiling glass doors.

    

STMicroelectronics

Location: 2525 Augustine Dr., Santa Clara, Ca
Budget: $584,951
Project Size: 89,257 sq. ft.

This tenant improvement consisted of R & D, sound studio and product development areas.

Teris

Location: 2455 Faber Place, Palo Alto, Ca
Budget: $700,000
Project Size: 12,000 sq. ft.

This project included demolition of the facility, including a structural steel mezzanine used for the building infrastructure. The construction of the space included relocating the transformers, FLS panels, and main electrical panels housed in the mezzanine. A new restroom core was built along wth offices, conference rooms and break rooms.

Hickman, Palermo, Trong & Becker, LLC.

Location: 1 Almaden, Ste. 1200, San Jose, Ca
Budget: $670,396
Project Size: 14,000 sq. ft.

This tenant improvement was performed on a fast track schedule in order to meet the client’s needs. A full floor Class “A” build out was completed in five weeks, located on the penthouse floor of the building a grand lobby was created.

    

BFGC

Location: 160 W. Santa Clara St., San Jose, Ca
Budget: $670,396.00
Project Size: 11,946 sq. ft.

This project was a class “A” high rise, architect’s office tenant improvement. Work included the creation of an office core as well as open office areas for workstations. The existing mechanical system was modified to condition the air for this tenant improvement.

    

         

JAMS LA

Location:  555 W. 5th St., Los Angeles, Ca
Budget:  $2,763,000
Project Size:  28,285 sq. ft.

This project was a two floor build out of class “A” showcase office suites. Some of the finishes included terrazzo flooring,floating acoustical ceilings, architectural glass walls, custom millwork throughout and custom water feature in the lobby.

                   

JAMS Century City

Location:  1925 Century Park East, Los Angeles, Ca
Budget:  $1,657,000
Project Size:  10,000 sq. ft.

This project was a partial floor build out of class “A” showcase office suites. Some of the finishes included terrazzo flooring,floating acoustical ceilings, architectural glass walls, custom millwork throughout and custom water feature in the lobby.

    

   

JAMS San Jose

Location:  160 W. Santa Clara St., San Jose Ca.
Budget:  $1,500,000
Project Size:  17,000 sq. ft.

This tenant improvement project located at 160 W. Santa Clara in San Jose consisted of a complete demo of the penthouse floor of the building leaving only the core to build out the class “A” showcase office suite.  Some of the finishes included terrazzo flooring, floating acoustical ceilings, architectural glass walls, custom millwork throughout and custom water feature in the lobby.

                

JAMS Las Vegas

Location:  3800 Howard Hughes Blvd., Las Vegas, NV
Budget:  $1,255,000
Project Size:  15,198 sq. ft.

This tenant improvement project consisted of a complete demo of the entire floor of the building leaving only the core to build out the class “A” showcase office suite.  Some of the finishes included terrazzo flooring, floating acoustical ceilings, architectural glass walls and custom millwork throughout.

    

 

Wells Fargo Tower

Las Vegas, NV

2nd, 3rd, 4th & 12th Floor Cores

These projects ran concurrently, consisted of demolition of the building elevator lobbies and restroom cores.  New ceiling and finishes were installed on a fast track schedule.

    

    

Five Guys Burgers and Fries

Locations:  121 Curtner Ave., 5353 Almaden Expressway, 4180 N. 1st St., and 5205 Prospect Rd. in San Jose; 112 E. Camino Real, Sunnyvale
Budget:  $302,000
Project Size:  3,000 sq. ft.

Work includes underground work, top out, Full kitchen with a class 1 hood, full prep area and dining.  Complete build out from a “warm shell”.  Some of the challenges were a fast paced schedule (6 Weeks) and Tile finishes throughout.